If you rang me in July wanting air conditioning for the summer, I had to tell you no. That is not about how busy we are. The equipment simply is not there to buy.
Lead times checked 8 November 2026. This is a moving picture, so ask us for the current position before you plan around it.
This is the honest picture of where supply is, how long you will wait, and what that means for anyone thinking about next summer. The short version: order in the winter and you will have it working before the weather turns. Wait until it is hot and you are buying for the summer after.
How long do I have to wait for air conditioning?
Quick Answer: Months, not days. In a normal year I could be fitting the week after you said yes. The equipment is the holdup, and the honest answer moves, so ask us where it stands on the day.
In a normal year I can get almost anything within a few days. If somebody accepted a quote on the Monday, I could be fitting it the following week. That is not where we are.
As I write this in November 2026, most of what I would want to order is not available until the end of February 2027, and I do not expect supply to be comfortable again much before the middle of 2027. Some individual items come sooner, and part of my job now is designing around what is actually available rather than what is theoretically best.
Treat that as a snapshot rather than a rule. It will move in both directions, and the only reliable number is the one I can give you for the kit your job actually needs. What has not changed, and will not change for a while, is the shape of it: the equipment is the queue, not the fitting.
A fitted system is no longer a quick purchase. Treat it like having a new kitchen or a new boiler, not like buying an appliance.
Why is there an air conditioning shortage in the UK?
Quick Answer: Demand across Europe this summer was far beyond anything the manufacturers had planned for, and one major manufacturer's factory was down for part of it.
Two things happened together. The summer was exceptional right across Europe, not just here, so demand did not arrive region by region the way it usually does. It arrived everywhere at once. At the same time, one of the big manufacturers had a shutdown through the summer months, which pushed everybody who would have bought from them onto the others.
What that leaves is a strange situation. The factories are still producing. What they are not doing is building any stock, because everything they make goes straight out to customers as it comes off the line. There is no buffer anywhere in the supply chain, so an order joins a queue rather than coming out of a warehouse.
Worth clearing up one piece of confusion while I am here: Mitsubishi Electric and Mitsubishi Heavy Industries are two different companies that make two different ranges. People use the name interchangeably and it causes no end of trouble when you are comparing quotes.
When should I order air conditioning for next summer?
Quick Answer: Now, if you want it working next summer. An order placed in the winter gets fitted in good time. An order placed in June is for the summer after.
Here is the pattern I see every year, made much worse this year. Nobody thinks about cooling in February. The first properly hot week arrives, everybody rings at once, and by then the equipment for that summer is spoken for.
The sensible order of events is this. Get the survey done now, while I have time to do it properly rather than squeezing it between jobs. Agree the design and the price. Place the order, which takes a deposit and secures your position in the queue, because I cannot order equipment without a committed job behind it. Then the fit happens when the kit lands, which is likely to be a quiet spring week rather than the hottest fortnight of the year.
The survey and the design can happen immediately. It is only the equipment that has a queue. Getting the first part done now costs you nothing and puts you at the front of it.
Is an old air conditioning quote still valid?
Quick Answer: If it is more than a few months old, probably not. Ask for it to be redone before you rely on it.
To be clear about what this does and does not mean: it is about quotes nobody has accepted yet. It is not about work already booked in. Once you have accepted and paid your deposit, that secures your order and we place the equipment order behind it.
I will be straight with you about the rest, because it affects how you read any quote, ours included. Equipment prices have been rising. Most manufacturers put theirs up in October, and this year they have moved more often than that. So a quote written in the spring, from us or from anyone else, may well need redoing before you can rely on the number.
That is also why there is a date on our pricing pages. A price with no date on it is not telling you very much.
Does the shortage affect commercial jobs too?
Quick Answer: Yes, and on a fit-out it needs to be in the programme from the start.
A great deal of what I quote is commercial, and lead times matter more there, not less. If air conditioning is going into a building that is being refurbished, the equipment needs ordering around the same time as the rest of the long-lead items, not when the decorators are nearly finished.
If you are managing a fit-out, bring your installer in early enough to get the pipework in before anything is boarded up, and get the equipment on order at the same time. The fitting itself happens later, after the first coat of paint, but the ordering cannot wait until then.
What should I do in the meantime?
A portable unit will get you through a hot spell, and there is no shame in one. Just know what you are buying. The compressor, the noisy part that would normally live outside, is in the room with you, and it has to be vented out of a window to work at all. I would happily use one to take the edge off a living room during the day. I would not want to sit watching television next to it in the evening, and I would not try to sleep in a room with one running.
One of our customers has a portable unit in his cinema room at the moment. He is having proper air conditioning fitted precisely because of the noise.
If a portable unit is doing the job well enough and you only need cooling for a fortnight a year, you may not need us at all. I would rather tell you that than sell you something.
Want it working next summer?
Now is the moment to get the survey done. Tell us which rooms you want cooled and we will come back with a realistic price range before anyone visits.
Get in touchFrequently asked questions
How long does it take to get air conditioning installed?
Two different answers, and people usually mean the first. The fitting is quick: one room, back to back through an outside wall, is a day, and a whole house of five or six rooms is about a week. Getting hold of the equipment is the slow part, and that has been running into months rather than days. Ask us for the current position before you plan around it.
Can you get any air conditioning sooner than that?
Sometimes. Certain items are still moving, and part of the design work is choosing equipment that is both right for the room and actually available. Ask us rather than assuming.
Is it worth waiting for prices to fall?
I would not plan around it. Prices have been going one way, and the annual increases land in October.
Does the same wait apply to repairs and servicing?
No. Servicing is unaffected, and most repairs are parts rather than whole systems, which is a different supply chain and much quicker.